Case Study

Dulwich Leisure Centre

Dulwich Leisure Centre
East Dulwich
Commercial

The brief

The main swimming pool at Dulwich Leisure Centre is a well-used community facility, welcoming swimmers, families, schools and fitness groups all year round.

With the demanding pool environment and heavy daily use, the pool hall had become tired and worn. It needed refurbishing to improve its appearance and create a brighter, more welcoming space for visitors.

Pool hall sheeted and protected during redecoration at Dulwich Leisure Centre
Poolside cubicles being redecorated at Dulwich Leisure Centre

What we did

Our team carried out a comprehensive internal refurbishment of the main pool hall, restoring and refreshing the space while keeping disruption to the facility to a minimum.

  • Preparation and redecoration: Fully prepared and redecorated the internal walls, columns, structural steelwork and ceiling elements.
  • Specialist coatings: Applied specialist coatings designed to withstand the humid, corrosive pool environment.
  • Brighter finishes: Refreshed all existing finishes to improve brightness and light reflection throughout the pool hall.
  • Repairs: Repaired and treated areas affected by wear and tear for a durable, long-lasting finish.
  • Finishing works: Completed detailed finishing works to lift the overall appearance of the facility.

Every part of the project was completed with quality and durability in mind, so the refurbished space will keep performing under the demands of a busy leisure centre.

The result

The refurbishment has transformed the main pool hall into a brighter, cleaner and more inviting space for visitors and staff alike. Fresh decorative finishes have revitalised the hall, making the most of the natural light and giving it a modern appearance while respecting the character of the building.

The completed works have improved the experience for the thousands of people who use the facility each year. The durable finishes will also help protect the building fabric and reduce ongoing maintenance, giving the leisure centre long-term value.

Refurbished main pool hall at Dulwich Leisure Centre

Before and after

Pool hall balcony stripped back before refurbishment at Dulwich Leisure Centre
Before
Pool hall balcony after refurbishment at Dulwich Leisure Centre
After

Talk to us about a project like this