Case Study

Kemnal Technology College

Kemnal Technology College
Orpington
School / College

The brief

Following a burst lead water pipe, the second floor at Kemnal Technology College suffered extensive water damage throughout the affected areas.

The brief was to restore the damaged areas and improve the overall condition, functionality and appearance of the building. This included refurbishing the bathroom and toilet facilities, replacing the main hall flooring, renewing the reception areas and installing a new suspended ceiling throughout the corridor, including two alcoves.

The project also called for acoustic ceiling tiles, 20 integrated LED ceiling lights and a new bulkhead around the rooflight.

Water-damaged corridor at Kemnal Technology College with ceiling tiles down after a burst pipe
New timber floor being laid in the main hall at Kemnal Technology College

What we did

Libra carried out a programme of reinstatement and refurbishment works to repair the water damage and upgrade the internal spaces.

  • Water damage reinstatement: Repaired, dried out and reinstated the areas damaged by the burst pipe before any new finishes were installed.
  • Suspended ceiling: Supplied and installed a metal suspended ceiling grid along the full length of the corridor, including both alcoves, with acoustic ceiling tiles throughout.
  • LED lighting: Supplied and installed 20 LED ceiling lights within the new ceiling grid, with the adaptations needed to take the fittings.
  • Rooflight bulkhead: Formed a bulkhead around the rooflight for a neat, integrated ceiling finish.
  • Main hall flooring: Removed the damaged main hall floor and laid a new timber floor for a clean, durable finish.
  • Floor sanding: Sanded and refinished timber floors, including the stage.
  • Toilets and bathrooms: Installed new toilet facilities, refitted the bathrooms and carried out interior remodelling and associated maintenance.
  • Reception areas: Refurbished and renewed the reception areas to create a more presentable, welcoming environment.

The result

The refurbishment restored the areas affected by the water damage while improving the building’s overall appearance and usability.

The new suspended ceiling and integrated LED lighting give the corridor a modern finish, with the acoustic tiles creating a consistent ceiling throughout and the rooflight bulkhead adding a more refined detail.

The renewed and refinished floors, new toilet facilities and refurbished reception areas have created cleaner, more functional and more presentable spaces across the second floor.

Overall, the project combined essential water damage reinstatement with wider improvement works, renewing key communal and service areas of the building.

Completed main hall timber floor at Kemnal Technology College

Before and after

Entrance lobby at Kemnal Technology College with the ceiling collapsed after water damage
Before
Refurbished entrance lobby at Kemnal Technology College with new flooring and LED downlights
After