Case Study

Perry Hall School

Perry Hall School
Orpington, Kent
School / College

The brief

A steep, eroded embankment ran the length of one side of the playground, cutting off a large area of ground the school could not safely use. Years of wear had stripped the grass back to bare soil, and rainwater ran straight off the slope and across the tarmac below. The school wanted the space back, level and usable in all weathers, with the work carried out around the school day so lessons were never disrupted.

What we did

Safety barriers went up before anything started, and the neighbouring structures were protected for the duration. We excavated the bank and built a retaining wall from steel girders and weather-treated timber sleepers, holding back the higher ground and squaring off the boundary.

Behind the new wall we levelled both playgrounds and laid artificial grass, then installed close-board fencing along the full boundary. ACO drains and a soakaway went in to take the water that had been running off the slope, new tarmac pathways were laid, and the existing sheds were relocated to open up more play area.

The result

The school gained a level, all-weather play area where there had been an unusable bank. Rainwater now drains away instead of running across the playground, the new fence line closed off the slope entirely, and moving the sheds freed up the far corner for play.